Our tree:
Dave & Josh in their WVU jackets (Before we left for Louisiana):
We headed down to Louisiana to spend Christmas with Josh's parents. It was great to spend time with everyone and get a chance to see how much our nephew and niece have grown.
Our Arrival in Louisiana:
Noah riding on Josh's suitcase:
Christmas Eve:
Monday, December 27, 2010
Friday, December 24, 2010
Family Room: Before & After Photos
Before:
Before: (Stupid wall seperating the breakfast nook/kitchen table area from the family room)
Before:
After: (Cody & my mom enjoying the new couch)
After:
The Finished Product:
Before: (Stupid wall seperating the breakfast nook/kitchen table area from the family room)
Before:
After: (Cody & my mom enjoying the new couch)
After:
The Finished Product:
Labels:
House
Wednesday, December 22, 2010
Too Busy to Blog
Wow, I have been a terrible blogger lately! So much has been going on! It has been just crazy lately. Upon moving into our new home, we immediately starting renovations on the house.
House Improvements:
-Ripped up all the floors on the first floor (there were 5 different types of flooring all on the main level). We had beautiful hardwood floors put in the entire first level with the exception of the laundry room and powder room which are now ceramic tile.
-Had the carpet ripped off the stairs as well as in the upstairs hallway and replaced it with same hardwood as the main level
-Had all 4 bedrooms carpet replaced
-Painted (most rooms - we still have more to do)
-Changed some light fixtures
-Ripped out the powder room on the main level(still a work in progress).
Because of the renovations, we were not able to start unpacking right away. The floors took about a week and a half so needless to say we still have MOUNTAINS of boxes to unpack! I am hoping the boxes will be unpacked before next Christmas. haha. :-)
House Improvements:
-Ripped up all the floors on the first floor (there were 5 different types of flooring all on the main level). We had beautiful hardwood floors put in the entire first level with the exception of the laundry room and powder room which are now ceramic tile.
-Had the carpet ripped off the stairs as well as in the upstairs hallway and replaced it with same hardwood as the main level
-Had all 4 bedrooms carpet replaced
-Painted (most rooms - we still have more to do)
-Changed some light fixtures
-Ripped out the powder room on the main level(still a work in progress).
Because of the renovations, we were not able to start unpacking right away. The floors took about a week and a half so needless to say we still have MOUNTAINS of boxes to unpack! I am hoping the boxes will be unpacked before next Christmas. haha. :-)
Subscribe to:
Posts (Atom)